Rates of Services
SNo
Service
Unit
Charges (RO)
1
Lease of industrial plots
Square metre/ per annum
500 Baizas for the first 5 years, thereafter, 500 Baizas.*
2
Electricity
KW/hour with bank capacitor
12 Baizas. (August - Mar) 24 Baizas (April – May)
3
Water
Gallon
3 Baizas
4
Gas
M3
20.5 Baizas
5
Construction permits
Permit
RO10
6
Construction drawings
Plan
RO 1
7
Duplicates of lost construction drawing/permit
Plan or Permit
Rate of original document
8
Duplicates of lost contract documents
Contract
RO5
9
Construction insurance deposit
Depend on project (refundable)
*To see the Lease of fees for PEIE - Square miter/ per annum - please press here